Water Infrastructure Decision Assurance

Assurance workspace — controlled demonstration using a fictional major desalination project.
Project
Coastal Water Supply
Stage
Development
Critical conflicts
1
Gate status
Blocked

Requirements assurance

RequirementStatusEvidenceIssue

Assurance chain

TECH-002 — Capacity basis → Evidence
Evidence → Claims: 100 ML/day and 120 ML/day
Conflicting claims → Critical finding
Critical finding → Gate readiness blocked

Change impact

A capacity change can propagate through requirements, claims, dependencies, risks and decision gates. The system preserves the previous state rather than silently overwriting it.

Critical finding

CRITICAL

Conflicting plant capacity claims

The controlled project contains both a 100 ML/day and a 120 ML/day capacity claim. An authoritative basis and verified evidence are required before gate progression.

Evidence lineage

Capacity design basis → Unresolved
Project evidence → Version + source locator
Verification → Human reviewer required

Decision gate

BLOCKED

At least one critical requirement remains conflicting or insufficiently established.

This workspace demonstrates decision assurance. It does not replace qualified engineering, regulatory, environmental, financial or investment decisions.